We're full steam ahead on production and here's where we are today.

Bracket Production

4" and 6" bracket production is 100% complete!!!! 

  

Slide Production

Slide production is underway.  The construction takes place in 2 phases.  

 Phase 1: The main slide is created and prepped for phase 2. The part in the middle that is being cut of is the point where the plastic was injected. In most products this nub is left alone (like this), but we wanted it removed for a smooth slide that won't snag clothes. In this phase it's cut flat so that it can be covered with with the blue non-slip over-mold in 2nd phase.

  

Phase 2: The non-slip blue over-mold is applied and the magnets are installed. 

 Finished slides awaiting packaging.

  

 That's all I have to report so far.  Production of the slides will be 25-30 days.  After that it will be 3-5 days to package the rewards.  Thanks again for your continued patience.  I'm 100% dedicated to delivering a top-notch product. 